Halyard
Roofing Co. · Maryland
Free inspection
Roof replacement · Maryland

Every roof
tells a story.

This one just lost a fight with a nor'easter. Scroll to watch our crew rebuild it, layer by layer.

or scroll
07:00

Day one. Crew on site.

Six roofers, one dumpster and a plan that starts with protecting your yard, not tearing into your roof.

Keep scrolling
Day one · 7:00 AM

Protect, then tear off.

A good roof starts with what you do before the first shingle comes off.

or scroll
10:30

Down to the wood.

With the old roof gone, the next four layers decide whether this roof lasts. Let's get closer.

Keep scrolling
The part nobody sees

Layers you'll never see.

This is where roofs actually fail, so this is where we slow down. Scroll in close.

or scroll
X-ray · cross-section

Six layers.
Zero shortcuts.

12:15

Dried in. Shingles next.

The roof is already watertight. Now the part you'll see from the street for the next few decades.

Keep scrolling
Afternoon

Course by course.

About two courses per foot, from the gutter to the ridge. Here's how the new roof goes on.

or scroll
Wrap-up

Done by dusk.

Most homes are finished in a single day. Keep scrolling.

or scroll
Home, protected

Your roof is next.

Free inspections across Maryland. We'll document any storm damage and meet your adjuster on site.

Book a free inspection
Same house · same camera

Morning vs. night.

Drag to compare the storm morning with the finished roof that same evening.

The finished charcoal roof at dusk
The storm-damaged roof the morning after
Before · 7:00 AM
After · 6:40 PM
Every Halyard roof

What's under the shingles.

01
Full tear-off

Down to the wood. Never a roof-over.

02
Deck inspection

Every sheet walked. Soft or rotted wood replaced.

03
New drip edge

At the eaves and rakes, not reused.

04
Ice & water shield

Eaves, walls, chimney and every pipe.

05
Synthetic underlayment

Over the whole deck, lapped and cap-nailed.

06
New flashing & pipe boots

Step flashing at walls, fresh boots on every vent.

07
Ridge vent

Continuous, for a cooler, drier attic.

08
Magnetic sweep, twice

Lawn, beds and driveway before we leave.

Manufacturer-backed warranty options, plus our own workmanship guarantee. Shingle line and colors chosen with you at the estimate.

How it works

Four steps. One day on the roof.

  1. 1
    Free inspection

    A drone and on-roof inspection with photos of everything we find. Storm damage? We document it and can meet your adjuster on site.

  2. 2
    Clear estimate

    One written price for the full scope, shingle line and color picked with you. No surprises on install day.

  3. 3
    Install day

    Protect, tear off, repair, dry in and shingle. Most homes are finished in a single day.

  4. 4
    Final walk

    We walk the roof and the yard with you, and leave the photos of every layer.

Questions

Straight answers.

Most homes are finished in a single day. Larger roofs, steep pitches or two layers of old shingles can take a second day. We'll tell you at the estimate.

Always a full tear-off. Going over old shingles hides soft decking and traps heat and moisture. Taking it down to the wood is the only way to know what's under there.

We walk every sheet once the old roof is off. Anything soft or water-damaged gets replaced before a single layer goes on top, and you'll see photos of it.

We'll inspect for free, document the damage with photos, and meet your adjuster on site if you'd like. Your claim stays between you and your insurer, and you're responsible for your deductible.

Yes. Home improvement contractors in Maryland must hold an MHIC license, and ours is on every contract, truck and estimate (MHIC # shown below).

Free roof inspection

See your roof from above.

We fly it, walk it and send you the photos, whether you need a new roof or just peace of mind.